Rollingwood Lagoon Closure

Actual Costs – $58,145 ($28,495 paid by ARRA Grant)
Completion Date – September 2010

  • Engineered by Shafer, Kline and Warren
  • Constructed by C.L. Richardson Company, Inc.
  • Closes the Rollingwood Lagoon
  • Area is currently served by the Midway Crossings WWTP
  • New water quality rules met by new plant

 

The closure of the Rollingwood Lagoon was funded in part by an ARRA grant.
Removing the sludge from the lagoon.
Removing sludge from the lagoon in order to remove it. The new Midway Crossings WWTP that replaced the lagoon is in the background.
The sludge has been removed and the old lagoon site is left to dry out.
The old lagoon site is now a green space on the outskirts of the Rollingwood Subdivision.
The old lagoon site has been graded and seeded.
The closure of the Rollingwood Lagoon was funded in part by an ARRA grant.