Sunrise Estates Pump Station Interceptor Sewer

Actual Costs – $951,900 ($465,265 ARRA Funds)

Cost Share with City of Columbia
City's Costs – $278,775
District's Cost – $207,860

Completion Date – August 2011

  • Engineered by Shafer, Kline and Warren
  • Constructed by Capital RR Excavating
  • Approximately 8,200 LF of gravity sewer ranging in diameter from 30” to 12”
  • Eliminates the Sunrise Estates Pump Station by connecting to the City of Columbia's wastewater treatment and collection system
  • Removes a potential source of accidental sewer overflows
  • Reduces electrical costs